preloader2.gif
Development and design of material control system with Android applications on POS handheld with NFC cards and supports offline mode
Development and design of material control system with Android applications on POS handheld with NFC cards and supports offline mode
project description

 

A system applied in Tanzania project with El Sewedy group and Arab Contractors with XApps Solutions as a technical consultant in digital transformation

Handheld point of sale (POS) device with Android application developed from scratch

System components:

  • Android application for diesel requester.
  • Web application for diesel requester.
  • Android application for browsers and tank stations.
  • Android application for Equipment supervisor.
  • Web dashboard application for system admin.

System Main Features:

  • Smart reporting system
  • Email notifications for any suspicious consumption.
  • Offline mode supported.
  • NFC cards for equipment drivers.

 

XApps Solutions contributes to the establishment of infrastructure & digital transformation in Africa in cooperation with El Sewedy Group and the Arab Contractors in Tanzania.
XApps cooperates with El Sewedy Group and the Arab Contractors to work on strengthening Egyptian-African relations in East Africa from Tanzania, where it contributed to the construction of the Julius Nyerere Dam.
It is considered one of the largest dams on the continent of Africa during the current century, especially in West Africa, where it helps to generate electrical power and save large amounts of water.
The Federation of Egyptian Companies El Sewedy Electric, the Arab Contractors, and XApps are implementing the project in terms of construction, electromechanical and digital transformation.
XApps Solutions also contributes to the project through digital transformation mechanisms in improving the performance of the material control system and raising its efficiency using NFC Near-field communication application technologies and programming fuel monitoring system applications, which contributed to raising the production efficiency of the project and reducing any waste of petroleum materials and early warning of machinery and equipment malfunctions.

project details

Clients: El Sewedy Group and Arab Contractors

Date: December 2022

Website: https://www.elsewedyelectric.com/en/home/